20-2583 |
12905 |
LILY ST |
92840 |
Aug 31, 2020 |
Sep 30, 2020 |
Finaled |
Residential |
Photovoltaic |
INSTALL (N) ROOF MOUNTED PVS 6.54KW AND (20) PANELS. 9/23/20 Revision to change panels layout |
|
TRUE POWER SOLAR |
$499.50
|
20-2582 |
12676 |
WOODBURY RD |
92843 |
Sep 14, 2020 |
Oct 26, 2020 |
Finaled |
Residential |
Photovoltaic |
INSTALL (N) ROOF MOUNTED PHOTOVOLTAIC SYSTEM 2.64kW AND (8) PANELS |
|
SEMPER SOLARIS CONSTRUCTION INC |
$499.50
|
20-2581 |
11271 |
BOWLES AVE |
92841 |
Aug 31, 2020 |
Oct 08, 2020 |
Finaled |
Residential |
Photovoltaic |
INSTALL (N) ROOF MOUNTED PVS 7.26KW AND (22) PANELS. UPGRADE SERVICE PANEL TO 200A (SR#002-944093) |
|
ORANGE COUNTY CONTRACTING SERVICES INC |
$659.50
|
20-2580 |
5471 |
CERULEAN AVE |
92845 |
Aug 31, 2020 |
May 11, 2021 |
Finaled |
Residential |
Photovoltaic |
INSTLL (N) ROOF MOUNTED PVS 6.825KW AND (21) PANELS. UPRADE SERVICE PANEL TO 200A (SR#2938648) |
|
VIVINT SOLAR |
$659.50
|
20-2579 |
6631 |
CHAPMAN AVE |
92845 |
Aug 31, 2020 |
|
Expired |
Residential |
Photovoltaic |
INSTLL (N) ROOF MOUNTED PVS 3.575KW AND (11) PANELS. UPRADE SERVICE PANEL TO 200A (ON PERMIT 20-2506) |
|
VIVINT SOLAR |
$499.50
|
20-2578 |
6752 |
LAURELTON AVE |
92845 |
Aug 31, 2020 |
May 04, 2021 |
Finaled |
Residential |
Photovoltaic |
INSTLL (N) ROOF MOUNTED PVS 3.575KW AND (11) PANELS. UPRADE SERVICE PANEL TO 200A (SR#2942231) |
|
VIVINT SOLAR |
$659.50
|
20-2577 |
6582 |
CHAPMAN AVE |
92845 |
Aug 31, 2020 |
Jan 11, 2023 |
Finaled |
Residential |
Photovoltaic |
INSTLL (N) ROOF MOUNTED PVS 5.20KW AND (16) PANELS. UPRADE SERVICE PANEL TO 200A (SR#00292263) |
|
VIVINT SOLAR |
$809.50
|
20-2576 |
11891 |
AMETHYST ST |
92845 |
Aug 31, 2020 |
Nov 16, 2020 |
Finaled |
Residential |
Photovoltaic |
INSTALL (N) PVS 6.08KW AND (19) PANELS |
|
ECOSOLAR USA ELECTRICAL LLC |
$499.50
|
20-2575 |
12092 |
FLAGSTONE AVE |
92843 |
Nov 30, 2020 |
Apr 20, 2021 |
Finaled |
Residential |
Grading |
GRADING FOR NEW ADU UNDER PLAN G-1420: CONSTRUCT NEW DETACHED ADU WITH 2 BEDROOMS IN FLOOD ZONE. FOR GRADING PHASE ONLY- ALL OTHER CONSTRUCTION TO BE DONE ON SEPARATE PERMIT. CONTACT INSPECTOR VINCENT DE LA ROSA (714)321-0723 48 HOURS PRIOR TO START OF WORK. |
|
|
$2,510.00
|
20-2574 |
11302 |
WOODBURY RD |
92840 |
Nov 30, 2020 |
|
Expired |
Residential |
Grading |
GRADING FOR NEW ADU PER GRADING PLAN G-1422: CONSTRUCT (N)ADU WITH 2 BEDROOMS IN FLOODZONE. FOR GRADING PHASE ONLY. ALL OTHER CONSTRUCTION WORK TO BE DONE ON SEPARATE PERMIT. PLEASE CONTACT VINCENT DE LA ROSA (714)321-0723 48 HOURS PRIOR TO START OF WORK. |
|
|
$2,240.00
|
20-2573 |
12231 |
DUNKLEE LN |
92840 |
Nov 17, 2020 |
|
Expired |
Residential |
Grading |
GRADING FOR NEW ADU PER GRADING PLAN G-1424: CONSTRUCT NEW ADU WITH 2 BEDROOMS IN FLOODZONE. FOR GRADING PHASE ONLY. ALL OTHER CONSTRUCTION WORK TO BE DONE ON SEPARATE PERMIT. CONTACT VINCENT DE LA ROSA (714)321-0723 TO COORDINATE INSPECTION AT LEAST 48 HOURS PRIOR TO START OF WORK. |
|
|
$15,114.53
|
20-2572 |
10852 |
MARIAN DR |
92840 |
Aug 31, 2020 |
Sep 16, 2020 |
Finaled |
Residential |
Reroof (Online) |
T/O 3 LAYERS 1/2 IN OSB REROOF MAIN STRUCTURE W/ 2-LAYER #30 FELT COMP SHINGLES 27 SQ 3/12 PITCH |
|
Sharon c Trujillo |
$252.96
|
20-2571 |
6121 |
SANTA CATALINA AVE |
92845 |
Aug 31, 2020 |
Sep 21, 2020 |
Finaled |
Residential |
Reroof (Online) |
T/O 1 LAYER REROOF MAIN STRUCTURE W/ SYNTHETIC UNDERLAYMENT COMP SHINGLES 24 SQ 4/12 PITCH |
|
HD Roofs Inc |
$279.99
|
20-2570 |
11421 |
MAC ST |
92841 |
Sep 01, 2020 |
|
Expired |
Residential |
All Other (Online) |
1-200amp temporary power pole |
|
A-Co Temporary POwer, Inc |
$240.00
|
20-2569 |
10301 |
HAZARD AVE |
92843 |
Aug 31, 2020 |
Sep 21, 2020 |
Finaled |
Residential |
Electric Service Panel Upgrade (Online) |
SERVICE PANEL UPGRADE. FROM 60 AMP TO 200 AMP OVERHEAD (SR#2-9343-16). EDISON SPOTTING STICKER MUST BE PRESENT AT CITY INSPECTION |
|
Michelle P Huynh |
$215.00
|
20-2568 |
12861 |
SPRING ST |
92845 |
Aug 31, 2020 |
Sep 18, 2020 |
Finaled |
Residential |
All Other (Online) |
1 outlet for outside |
|
HQ Remodeling & Design |
$181.00
|
20-2567 |
9701 |
MANSOR AVE |
92844 |
Sep 01, 2020 |
Sep 03, 2020 |
Finaled |
Residential |
Miscellaneous Plumbing (Online) |
PLUMBING SEWER REPAIR ABS MATERIAL. REPLACE 2 FIXTURES. |
|
Adeedo |
$229.00
|
20-2565 |
9792 |
GARDEN GROVE BLVD |
92844 |
Aug 31, 2020 |
|
Expired |
Commercial |
Outdoor Dining (COVID-19) Temporary |
QUAN BUN- Outdoor dining 4 Tables with 16 seats maximum. 3/2/21 through 6/1/21. All Federal, State, County and Municipal laws apply. The applicant is responsible for complying with OC Health & CDC requirements, etc. Accommodations shall provide equal accessibility. |
|
|
|
20-2564 |
9602 |
BLANCHE AVE |
92841 |
Aug 27, 2020 |
Oct 15, 2020 |
Finaled |
Residential |
Remodel |
KITCHEN REMODEL (MEPs), TANKLESS WATER HEATER/ REPLACE FRONT DOOR |
$12,000.00 |
|
$649.49
|
20-2563 |
13402 |
ASHWOOD ST |
92843 |
Aug 29, 2020 |
Jan 28, 2021 |
Finaled |
Residential |
Electric Service Panel Upgrade (Online) |
SERVICE PANEL UPGRADE. EDISON APPROVED RELOCATION FROM 100 AMP TO 200 AMP OVERHEAD (SR# 2937269). EDISON SPOTTING STICKER MUST BE PRESENT AT CITY INSPECTION |
|
Huyen pham |
$215.00
|
20-2562 |
13322 |
GREENTREE AVE |
92840 |
Aug 27, 2020 |
Sep 08, 2020 |
Finaled |
Residential |
Reroof (Online) |
T/O 1 LAYER REROOF MAIN STRUCTURE, GARAGE W/ 2-LAYER SYNTHETIC UNDERLAYMENT COMP SHINGLES 25 SQ 3/12 PITCH |
|
TITAN HOME REMODELING |
$185.39
|
20-2561 |
9522 |
JOYZELLE DR |
92841 |
Aug 31, 2020 |
Sep 02, 2020 |
Finaled |
Residential |
All Other (Online) |
Replace sewer add clean out |
|
Drain Right |
$219.50
|
20-2560 |
13302 |
JEFFERSON ST |
92844 |
Aug 27, 2020 |
Sep 04, 2020 |
Finaled |
Residential |
Miscellaneous Plumbing (Online) |
PLUMBING REPIPE COPPER MATERIAL. REPLACE 150 FEET OF LINE. REPLACE 9 FIXTURES. |
|
CARE PLUMBING, INC |
$295.50
|
20-2559 |
12236 |
ANZIO ST |
92841 |
Aug 28, 2020 |
|
Expired |
Residential |
Electric Service Panel Upgrade (Online) |
SERVICE PANEL UPGRADE. FROM 100 AMP TO 200 AMP OVERHEAD (SR# 002944071). Edison spotting sticker must be present at city inspection. |
|
Vivint Solar |
$215.00
|
20-2558 |
12531 |
TOPAZ ST |
92845 |
Aug 28, 2020 |
Sep 17, 2020 |
Finaled |
Residential |
Reroof (Online) |
T/O 2 LAYERS 1/2 IN OSB REROOF MAIN STRUCTURE, GARAGE W/ SYNTHETIC UNDERLAYMENT COMP SHINGLES 25 SQ 4/12 PITCH |
|
Salvador Barahona |
$225.93
|
20-2557 |
12571 |
PALOMAR ST |
92845 |
Aug 28, 2020 |
Sep 17, 2020 |
Finaled |
Residential |
Reroof (Online) |
T/O 2 LAYERS 1/2 IN OSB REROOF MAIN STRUCTURE, GARAGE W/ 2-LAYER SYNTHETIC UNDERLAYMENT COMP SHINGLES 28 SQ 3/12 PITCH. 9/15/20 Revision to change roof pitch to 4/12 |
|
Salvador Barahona |
$239.45
|
20-2556 |
14140 |
BROOKHURST ST |
92843 |
Aug 27, 2020 |
Oct 14, 2020 |
Finaled |
Commercial |
Mechanical Permit |
MECHANICAL PERMIT FOR BUILDING PERMIT #19-2316- ADDITION OF TYPE I HOOD SYSTEM & MAKEUP AIR UNIT TO SERVE EXISTING KITCHEN COOKING EQUIPMENT. ANSUL SYSTEM BY SEPARATE PERMIT. |
|
FIRE SERVICE CORP. |
$325.00
|
20-2555 |
8421 |
ORANGEWOOD AVE |
92841 |
Nov 03, 2020 |
Dec 17, 2020 |
Finaled |
Commercial |
Photovoltaic |
INSTALLATION OF A PHOTOVOLTAIC SYSTEM. THIS SYSTEM IS CONSIDERED GRID INTERACTIVE WHICH WILL INTERCONNECT WITH THE ELECTRIC DISTRIBUTION GRID AT ORANGEWOOD CHURCH. THE PHOTOVOLTAIC SYSTEM CONSISTS OF (88) 345 WATT PHOTOVOLTAIC MODULES, (2) 11.4 KW UTILITY INTERACTIVE INVERTERS, SYSTEM TO BE ROOF MOUNTED |
$30,360.00 |
ECOFORCE SOLUTIONS |
$1,144.09
|
20-2554 |
10852 |
WOODBURY RD |
92843 |
Aug 27, 2020 |
Sep 03, 2020 |
Finaled |
Residential |
Water Heater Replacement (Online) |
WATER HEATER C/O 40 GAL LOCATED GARAGE |
|
AFFORDABLE WATER HEATERS |
$210.00
|
20-2553 |
9091 |
ORANGEWOOD AVE |
92841 |
Sep 14, 2020 |
Oct 30, 2020 |
Finaled |
Residential |
Reroof (Online) |
T/O 1 LAYER REPAIR SHEATHING REROOF MAIN STRUCTURE, GARAGE, PATIO W/ 2-LAYER #30 FELT COMP SHINGLES 28 SQ 3/12 PITCH. Existing Shiplap Sheathing, Possible patch or 1/2" OSB Overlay depending on condition. Facia, Rake & Rotten Patio Wood Structure Remove & Replace |
|
The Trades Group, Inc |
$252.96
|