22-0588 |
11462 |
BOWLES AVE |
92841 |
Feb 16, 2022 |
May 24, 2022 |
Finaled |
Residential |
Photovoltaic |
INSTALL (N) ROOF MOUNTED PVS 8.08KW AND (19) PANELS FOR MAIN HOUSE. 3/16/22 Revision to change system layout. 5/9/22 Revision to relocate 40A, 2P pool to MSP |
|
SUNPOWER CORPORATION SYSTEMS |
$424.50
|
22-0587 |
13392 |
LAUX CIR |
92840 |
Feb 15, 2022 |
|
Expired |
Residential |
Demo |
DEMO PATIO COVER ATTACHED TO REAR |
$2,000.00 |
VINA SWIMMING POOL (DONNY TRAN) |
$218.20
|
22-0586 |
9778 |
ORANGEWOOD AVE |
92841 |
Feb 15, 2022 |
|
Expired |
Residential |
Photovoltaic |
INSTALL (N) ROOF MOUNTED PVS 4.42KW AND (13) PANELS FOR ADU |
|
LA SOLAR GROUP |
$424.50
|
22-0585 |
13053 |
CHAPMAN AVE |
92868 |
Feb 15, 2022 |
|
Expired |
Commercial |
Alterations |
INSTALL APPROXIMATELY 100 (N) SHELVING UNITS |
$76,000.00 |
POLLARD CONSTRUCTION & FABRICATION INC |
$1,624.00
|
22-0584 |
8811 |
JOYZELLE DR |
92841 |
Feb 15, 2022 |
Oct 04, 2022 |
Finaled |
Residential |
Photovoltaic |
INSTALL (N) ROOF MOUNTED PVS 6.46KW AND (17) PANELS, UPGRADE SERVICE PANEL TO 225A (SR#) FOR MAIN HOUSE |
|
MARC JONES CONSTRUCTION LLC DBA SUNPRO SOLAR |
$424.50
|
22-0583 |
12172 |
ROBERT LN |
92840 |
Feb 15, 2022 |
|
Expired |
Residential |
Demo |
DEMO SWIMMING POOL IN REAR YARD PER CITY POLICY. PROVIDE SOILS A) ENGINEER EXPANSION INDEX B) SOILS ENGINEER CERTIFIED COMPACTION TO MINIMUM 90% - NO FUTURE CONSTRUCTION ALLOWED OVER THIS AREA WITHOUT ENGINEERED FIELD MEMO. |
$5,000.00 |
VINA SWIMMING POOL (DONNY TRAN) |
$196.14
|
22-0582 |
6741 |
LAURELTON AVE |
92845 |
Feb 15, 2022 |
Mar 03, 2022 |
Finaled |
Residential |
Reroof (Online) |
T/O 1 LAYER 1/2 IN CDX REROOF MAIN STRUCTURE, GARAGE W/ #30 FELT COMP SHINGLES 22 SQ 4/12 PITCH |
|
Eliseo Lopez |
$293.51
|
22-0581 |
12532 |
MONROE ST |
92841 |
Feb 15, 2022 |
Mar 03, 2022 |
Finaled |
Residential |
All Other (Online) |
NEW GAS METER FOR DETACHED ADU |
|
Lynn Hoa Phan |
$198.50
|
22-0580 |
13101 |
HARBOR BLVD |
92843 |
Feb 16, 2022 |
Dec 05, 2022 |
Finaled |
Commercial |
Sign |
INSTALL (N)(1) 5 FT LOGO CABINET, (1) ILLUMINATED LETTER CHANNEL SIGN, AND C/O (2) PYLON TENANT FACES |
$2,000.00 |
G & J NEON SIGNS INC |
$392.70
|
22-0579 |
12332 |
OAKWOOD ST |
92840 |
Feb 16, 2022 |
Jul 18, 2022 |
Finaled |
Residential |
Demo |
DEMO NON-PERMITTED PATIO COVER |
|
peter pham |
$196.14
|
22-0578 |
8812 |
ACACIA AVE |
92841 |
Feb 15, 2022 |
|
Expired |
Residential |
All Other (Online) |
Requesting permit in regards to temporary power pole installation. SR3225678 |
|
Ultimate Konstruction |
$240.00
|
22-0577 |
7351 |
ORANGEWOOD AVE |
92841 |
Feb 15, 2022 |
Jun 26, 2023 |
Finaled |
Commercial |
Fire Alarm |
MODIFY (E) FIRE ALARM SYSTEM. RELOCATE (E) AND ADD (N) DEVICES. OCFA SR # 293161 |
|
FACILITIES PROTECTION SYSTEMS |
$50.00
|
22-0576 |
12302 |
QUARTZ PL |
92843 |
Feb 14, 2022 |
Jan 18, 2023 |
Finaled |
Residential |
Demo (Code Enforcement) |
REF CASE# 187508. 1) REMOVE NON-PERMITTED PATIO ENCLOSURE ON THE BACK OF THE HOUSE (APPROX. 14FT X 22FT). 2) REMOVE NON-PERMITTED DETACHED LIVING UNIT IN THE BACKYARD (APPROX. 20FT X 30FT) 3) RESTORE THE GARAGE BY REMOVING ALL INTERIOR WALLS, ALL DRYWALL ON THE WALLS AND CEILING, ALL POROUS FLOORING, CAP ALL UTILITIES BACK AT THEIR SOURCE, AND ENSURE THE OVERHEAD GARAGE DOOR IS OPERATIONAL. |
|
|
$196.79
|
22-0575 |
15152 |
SPAR ST |
92843 |
Feb 14, 2022 |
Aug 10, 2022 |
Finaled |
Residential |
Revision |
REVISION TO PERMIT 21-1044- EXISTING BEDROOM 4 TO BE CONVERTED TO NEW FAMILY ROOM, DEN TO BE CONVERT TO EXISTING BEDROOM 4 |
|
|
$135.00
|
22-0574 |
8901 |
SEQUOIA CT |
92841 |
Feb 14, 2022 |
Apr 26, 2022 |
Finaled |
Residential |
Electrical Permit |
INSTALL (N) LIGHTS INSIDE LIVING ROOM W/ DIMMER. REPLACE ICE MAKER IN KITCHEN. REPLACE KITCHEN SINK AND REPLACE (2) TOILETS |
|
A BUILDERS INC |
$345.50
|
22-0573 |
9092 |
CENTRAL AVE |
92844 |
Feb 14, 2022 |
Mar 29, 2022 |
Finaled |
Residential |
Water Heater Replacement (Online) |
WATER HEATER C/O 50 GAL LOCATED OTHER LOCATION |
|
Mai Luong |
$210.00
|
22-0572 |
12532 |
WOODLAND LN |
92840 |
Feb 11, 2022 |
|
Expired |
Residential |
Reroof (CalHome Grant) |
REROOF CALHOME GRANT - REROOF/ROOF REPAIR |
|
|
|
22-0571 |
7912 |
GARDEN GROVE BLVD |
92841 |
Mar 15, 2022 |
Sep 28, 2022 |
Finaled |
Commercial |
Cell Site |
CELL SITE MODIFICATION. SEE PLANS FOR FULL SCOPE OF WORK |
$45,000.00 |
R D ENGINEERING & CONSTRUCTION INC |
$1,268.55
|
22-0570 |
12372 |
LOUISE ST |
92841 |
Feb 15, 2022 |
|
Expired |
Residential |
Photovoltaic |
INSTALL (N) ROOF MOUNTED PVS 8.875KW AND (25)PANELS FOR MAIN HOUSE |
|
SUNRUN INSTALLATION SERVICES INC |
$424.50
|
22-0569 |
11586 |
SAFFORD E |
92840 |
Feb 14, 2022 |
Mar 03, 2022 |
Finaled |
Residential |
Photovoltaic |
INSTALL (N) ROOF MOUNTED PVS 2.92KW AND (8) PANELS FOR ADU |
|
SOUTHWEST SUN SOLAR |
$424.50
|
22-0568 |
12851 |
BARTLETT ST |
92845 |
Feb 14, 2022 |
Apr 04, 2022 |
Finaled |
Residential |
Mechanical Permit |
INSTALL (N) TESLA BATTERY SYS 10.0KW, (2) TESLA POWERBALL BATTERIES AND (1) LOAD CENTER |
|
TLP ELECTRIC INTEGRATIONS INC |
$225.00
|
22-0567 |
12211 |
MAGNOLIA ST |
92841 |
Feb 11, 2022 |
Jun 06, 2022 |
Finaled |
Commercial |
Cell Site |
CELL SITE MODIFICATION. SEE PLANS FOR FULL SCOPE OF WORK |
$25,000.00 |
QUALTEK WIRELESS LLC |
$863.17
|
22-0566 |
12702 |
HASTER ST |
92840 |
Feb 15, 2022 |
Jan 17, 2023 |
Finaled |
Residential |
Photovoltaic |
INSTALL (N) ROOF MOUNTED PVS 3.905KW AND (11)PANELS FOR MAIN HOUSE. 7/8/22 Revision to change module type to Trina Solar |
|
SUNRUN INSTALLATION SERVICES INC |
$424.50
|
22-0565 |
11965 |
EASY WAY |
92840 |
Feb 11, 2022 |
Mar 24, 2022 |
Finaled |
Residential |
Photovoltaic |
INSTALL (N) ROOF MOUNTED PVS 4.38KW AND (12) PANELS FOR ADU. 3/8/22 Revision to roof layout and corrected the SLD to show solar tied into the subpanel. |
|
SKY LIMIT VENTURE CORP dba SKY LIMIT ENERGY |
$424.50
|
22-0564 |
11641 |
BROOKSHIRE AVE |
92840 |
Feb 14, 2022 |
Mar 02, 2022 |
Finaled |
Residential |
Photovoltaic |
INSTALL (N) ROOF MOUNTED PVS 5.84KW AND (16) PANELS FOR MAIN HOUSE. 2/28/22 Revision MSP to 2-gang panel |
|
SOUTHWEST SUN SOLAR |
$424.50
|
22-0563 |
12043 |
GILBERT ST |
92841 |
Feb 11, 2022 |
Mar 31, 2022 |
Finaled |
Residential |
Photovoltaic |
INSTALL (N) ROOF MOUNTED PVS 2.20KW AND(8) PANELS ON ATTACHED ADU |
|
SOLAR 360 BUILDING SERVICES INC |
$424.50
|
22-0562 |
9761 |
IMPERIAL AVE |
92844 |
Feb 14, 2022 |
Mar 17, 2022 |
Finaled |
Residential |
Photovoltaic (Code Enforcement) |
REF CASE# 187998. INSTALL (N) ROOF MOUNTED PVS 874KW AND (23) PANELS FOR MAIN HOUSE |
|
AAA SUN BUILDERS |
$424.50
|
22-0561 |
12041 |
NELSON ST |
92840 |
Feb 14, 2022 |
Aug 03, 2022 |
Finaled |
Residential |
Patio Enclosure |
INSTALL (N) 351 SF PATIO ENCLOSURE |
$35,000.00 |
HOMAZ BUILDERS |
$1,351.51
|
22-0560 |
11382 |
ORA DR |
92840 |
Aug 24, 2022 |
Jul 06, 2023 |
Finaled |
Residential |
Revision |
REVISION TO PERMIT 21-4992. REVISE FIRE SPRINKLER PLANS TO ADD ADDITIONAL HEADS AND RELOCATE RISER. OCFA SR 299134 |
|
UNITED FIRE & SAFETY CO |
$50.00
|
22-0559 |
13251 |
ROAN RD |
92843 |
Feb 14, 2022 |
May 23, 2022 |
Finaled |
Residential |
Demo (Code Enforcement) |
CODE CASE # 183441: PER ITEM #6, DEMO SWIMMING POOL IN REAR YARD PER CITY POLICY. PROVIDE SOILS A) ENGINEER EXPANSION INDEX B) SOILS ENGINEER CERTIFIED COMPACTION TO MINIMUM 90% - NO FUTURE CONSTRUCTION ALLOWED OVER THIS AREA WITHOUT ENGINEERED FIELD MEMO. |
|
|
$196.14
|